SEC. 2001. ARTIFICIAL INTELLIGENCE AND MACHINE LEARNING.
(a) PROGRAM. The National Science Foundation and the Secretary, acting through NIST for measurement functions, shall support fundamental algorithms, efficient and reliable model development, evaluation tools, accessible research computing, and applications producing independently testable public benefits. Awards may support smaller research institutions and enterprises that lack access to proprietary computing infrastructure.
(b) ELIGIBLE WORK. Projects may include data-efficient methods, interpretability, robustness, privacy-preserving learning, multilingual accessibility, scientific discovery, and assurance of high-impact systems. A commercial award shall identify the funded model or application and shall not finance unrestricted acquisition of unrelated businesses or speculative compute reservations.
(c) MEASURES. The agency shall evaluate reproducible task performance, reliability under distribution changes, security, energy and water demand, access costs, and performance for affected populations. Model parameter count, publicity, or computing expenditure alone is not evidence of benefit.
(d) CONDITIONS. Title X applies. Funding shall not establish a government-approved political viewpoint or a blanket license to acquire personal or copyrighted material. Independent evaluation shall distinguish laboratory benchmarks from demonstrated performance in the intended setting.
(e) COMMON SECTOR RULE. Every program in sections 2001 through 2040 shall operate within the accounts and limits in title XVIII and the common requirements of this Act. Its lead agency shall publish an initial implementation plan within one year, include measurable milestones in awards, report annually, and evaluate the program at least every five years. A sector designation creates no additional appropriation, exemption, or entitlement.
SEC. 2002. SEMICONDUCTORS, ADVANCED PACKAGING, AND MICROELECTRONICS.
(a) PROGRAM. The Secretary shall support domestic capability in semiconductor fabrication, mature and specialized nodes, advanced packaging, substrates, power electronics, memory, testing, and essential production equipment. NIST shall lead metrology and interoperability work; Energy and NSF may support research within their assignments.
(b) CAPACITY PLAN. A major award shall identify the technological capability, credible customers or public need, production ramp, yield assumptions, equipment delivery, workforce, energy, water, chemicals, and waste-treatment capacity. The agency shall examine overlap with existing Federal semiconductor support and document the remaining funding gap.
(c) SHARED FACILITIES. Assistance may finance pilot lines, packaging prototyping, and testing access for unaffiliated firms and researchers. Access terms shall protect customer designs while preventing discriminatory foreclosure by an operator that also competes with its users.
(d) MEASURES. Performance shall include qualified output, yield at the stated specification, utilization, time to qualification, input bottlenecks, workforce completion, and verified environmental performance. An announced fabrication facility or installed tool shall not be reported as qualified commercial output.
(e) SAFEGUARDS. Awards shall address fluorinated process gases, toxic chemicals, PFAS, water scarcity, sensitive process information, and security controls under the relevant titles. A funded capacity commitment does not authorize an export or investment prohibited by another law.
(a) PROGRAM. NSF, Energy, and NIST shall support quantum computing, simulation, sensing, communication research, error correction, cryogenics, control electronics, and fabrication or measurement tools needed to test proposed capabilities.
(b) EVIDENCE. Awards shall distinguish scientific exploration from a claimed commercially useful advantage. A milestone asserting such advantage shall identify the task, classical comparison, error rate, resources, reproducibility, and assumptions that determine the comparison.
(c) INFRASTRUCTURE. Shared test facilities and training may be funded where independent demand and an operating plan are demonstrated. Vendor-neutral access shall be required where practicable, with protection for legitimate confidential designs.
(d) MEASURES. Reports shall include stability, fidelity, calibration burden, reproducible sensing or computation performance, total operating cost, and the contribution of enabling components. Counting nominal qubits or patent filings alone does not satisfy an outcome milestone.
(e) SECURITY AND TRANSITION. Projects shall coordinate with lawful export and research-security requirements and with post-quantum security work under section 2004. An uncertain technology timeline shall be disclosed; it shall not justify premature retirement of an essential working system or an unsupported claim that all existing encryption has become ineffective.
SEC. 2004. CYBERSECURITY AND CRYPTOGRAPHIC RESILIENCE.
(a) PROGRAM. NIST and the Secretary, in consultation with the Department of Homeland Security, shall support secure software engineering, memory safety, identity and access protection, supply-chain assurance, vulnerability research, and migration of funded systems to appropriately validated cryptographic standards.
(b) ELIGIBLE PROJECTS. Assistance may support security tools for smaller enterprises and public institutions, reproducible testing, secure update mechanisms, cryptographic inventory, and transition planning for long-lived sensitive data. An award shall identify the systems protected, intended users, and maintenance responsibilities.
(c) RESEARCH PROTECTIONS. Testing shall occur with lawful authorization and safe disclosure procedures. This section does not authorize unauthorized access, interception, credential theft, or offensive action against a third party. A funding agency may not require researchers to conceal a vulnerability merely to avoid embarrassment.
(d) MEASURES. Evaluation shall include independently verified reduction of exploitability, remediation time, support life, recovery testing, and usability that affects actual adoption. A larger volume of alerts without demonstrated accuracy or response capability is not itself a public benefit.
(e) PROCUREMENT. Federally supported security infrastructure shall avoid unnecessary exclusive dependencies and shall include an exit and continuity plan. Sensitive findings shall be disclosed through coordinated procedures without granting permanent secrecy to a known public safety risk.
SEC. 2005. CLOUD, EDGE, AND DATA-CENTER INFRASTRUCTURE.
(a) PROGRAM. The Secretary, in consultation with Energy and NSF, shall support efficient, resilient computing infrastructure that addresses a documented research, public-service, or industrial bottleneck. Assistance shall not merely subsidize a commercial provider’s ordinary replacement cycle or land accumulation.
(b) RESOURCE PLAN. A major project shall demonstrate reliable electricity, deliverable clean supply, water availability, backup requirements, interconnection cost allocation, heat-management capability, and credible demand. A memorandum from a speculative customer is not equivalent to an enforceable load commitment.
(c) ACCESS. Shared research or public-service infrastructure shall offer transparent prices, portability, service-level terms, and access for eligible unaffiliated users. Project data shall not be used for unrelated advertising or model training without the authorization required by title X.
(d) MEASURES. Awards shall measure useful work delivered, actual utilization, total energy and water demand, energy per appropriate workload, reliability, cooling performance, and cost of migration. An efficiency ratio shall not conceal rising absolute consumption or offsite burdens.
(e) LOCAL PROTECTION. A recipient shall fund its attributable interconnection and abandonment risk and comply with noise, emissions, water, and land-use law. A facility’s importance to computing does not exempt it from the clean-facility schedule or public participation.
SEC. 2006. TELECOMMUNICATIONS, BROADBAND, AND SECURE NETWORKS.
(a) PROGRAM. Commerce, through its telecommunications responsibilities and in consultation with the Federal Communications Commission, shall support secure network equipment, interoperable architectures, rural and remote connectivity, resilient backhaul, next-generation wireless research, and accessibility.
(b) GAP ANALYSIS. Deployment assistance shall identify unserved or underserved needs using reliable information and shall coordinate with existing Federal and State broadband programs. Duplicating an adequately served network requires a documented competition, resilience, or capacity benefit, not merely a second subsidy claim.
(c) OPERATING TERMS. Awards for service infrastructure shall specify coverage, verified performance, affordability obligations appropriate to the award, maintenance, outage restoration, and consumer disclosures. A recipient shall not count a household as connected solely because a cable passes nearby.
(d) MEASURES. Reporting shall include actual service availability, adoption, price, latency, reliability, accessibility, and restoration time, with distinctions between advertised and independently measured performance.
(e) AUTHORITY. Spectrum licensing, radio interference, communications privacy, and equipment authorization remain governed by applicable law. This section creates no spectrum license, surveillance authority, or exemption from lawful security restrictions. Interoperability requirements shall preserve legitimate network security rather than require disclosure of protected customer traffic.
(a) PROGRAM. Energy, NSF, and NIST shall support high-performance computing, scientific software, advanced simulation, imaging, analytical instruments, and specialized systems serving multiple research and industrial communities.
(b) FACILITY JUSTIFICATION. A major capital project shall identify user demand, performance requirements, software and data support, staffing, energy, replacement cycles, and the cost of maintaining reproducible access. A procurement shall assess alternatives, including shared access and modernization of an existing facility.
(c) USER ACCESS. Allocation of publicly supported time shall use transparent technical criteria, conflict controls, and accessible applications. Legitimate proprietary or controlled work may be accommodated under stated terms without displacing the public mission through undisclosed preference.
(d) MEASURES. The agency shall evaluate completed scientific or engineering work, time to solution, validated accuracy, software portability, utilization, user diversity, and lifecycle cost. A peak hardware rating alone does not establish productive value.
(e) STEWARDSHIP. Awards shall include data management, instrument calibration, reproducible software environments, security updates, and an exit or migration plan. Decommissioning shall address data protection, critical-material recovery, and transfer of usable equipment where lawful and economically justified.
SEC. 2008. ROBOTICS AND INDUSTRIAL AUTOMATION.
(a) PROGRAM. Commerce, NSF, and NIST shall support industrial robots, assistive robotics, agricultural automation, inspection systems, machine perception, control systems, and tooling that improves independently measured productivity, safety, or accessibility.
(b) DEPLOYMENT. A demonstration shall identify its real operating environment, human interaction, failure modes, maintenance, emergency stop functions, and worker training. A laboratory result shall not be represented as safe autonomous performance in an untested setting.
(c) SMALL ENTERPRISE ACCESS. Shared demonstrations, leasing models, and extension services may assist smaller manufacturers and farms, subject to transparent total cost, repair access, cybersecurity, and contractual freedom to change suppliers.
(d) MEASURES. Awards shall measure task quality, safe uptime, net throughput, injury exposure, energy demand, maintenance cost, and effects on workers. Reported labor savings shall distinguish genuine productivity from shifted unpaid work, unsafe staffing, or activity moved to an unmeasured contractor.
(e) SAFEGUARDS. The workforce and digital titles apply. Assistance shall not support autonomous lethal targeting or create authority to use force. Safety-critical deployment shall remain subject to the regulator and law governing the activity.
SEC. 2009. ADVANCED MANUFACTURING AND ADDITIVE PRODUCTION.
(a) PROGRAM. Commerce and NIST shall support additive manufacturing, precision machining, digital process control, advanced joining, industrial simulation, inspection, and production methods with a documented capability or cost advantage.
(b) VALIDATION. Projects shall establish material properties, repeatability, tolerances, durability, defect detection, process qualification, and appropriate quality assurance. A prototype’s successful fabrication does not establish qualification for medical, aviation, structural, or other safety-critical use.
(c) TRANSFER. Assistance may support common test artifacts, qualification data, training, and integration services for small and medium-sized manufacturers. Shared facilities shall permit legitimate competition among materials, tools, and software providers rather than require a proprietary closed chain without justification.
(d) MEASURES. Milestones shall address qualified parts produced, first-pass yield, scrap, lead time, resource intensity, unit economics at realistic utilization, and independently verified reliability.
(e) CONDITIONS. Awards shall address worker exposure to powders, particles, solvents, and machine hazards; cybersecurity of production files; and lawful intellectual-property rights. Digital manufacturing support does not authorize reproduction of protected designs or controlled articles without legal permission.
SEC. 2010. ADVANCED MATERIALS, PHOTONICS, AND NANOTECHNOLOGY.
(a) PROGRAM. NSF, Energy, NIST, and Commerce shall support materials discovery, photonics, coatings, composites, ceramics, superconducting and magnetic materials, and nanoscale technologies with a defined research or productive purpose.
(b) SCALE-UP. A project moving toward production shall evaluate feedstock availability, reproducibility, processing energy, toxicology, durability, recyclability, and the performance of substitutes. A laboratory material shall not receive a commercial capacity award without a credible manufacturing and qualification pathway.
(c) SAFETY. Research shall characterize relevant exposure routes and uncertainties, including worker and environmental exposure to novel particles and persistent substances. Lack of complete hazard data is a reason for proportionate testing and containment, not a categorical representation of safety.
(d) MEASURES. Evaluation shall use reproducible physical performance, yield, lifetime, cost at the proposed scale, input dependence, and lifecycle environmental effects. Material strength or efficiency improvements shall be assessed in the intended system rather than isolated from other costs.
(e) ACCESS. Publicly funded reference materials, testing methods, and nonconfidential measurement results shall be disseminated under title III. Exclusive rights shall not prevent use of a publicly funded measurement standard where the award reserved access.
SEC. 2011. CRITICAL MINERALS AND STRATEGIC MATERIALS RECOVERY.
(a) PROGRAM. Commerce, Energy, and the Department of the Interior, within their respective authorities, shall support separation, refining, processing, substitution, recovery from waste streams, and efficient use of materials necessary for strategic technologies.
(b) PROJECT EVIDENCE. A project shall establish feedstock quality, lawful access, processing recovery, waste and tailings management, water requirements, energy, customers, financial assurance, and closure responsibility. A mineral resource estimate is not a proven economically recoverable reserve or an operating supply source.
(c) ALTERNATIVES. Review shall compare primary extraction with recycling, substitution, recovery from existing waste, and reduced material intensity where those alternatives can meet the stated need. Assistance shall not excuse an applicant from obtaining mining, water, land-use, or environmental authorization.
(d) MEASURES. Milestones shall include qualified material output, recovery rate, purity, actual domestic processing capability, reduction of single-source dependence, waste generation, and cost under commodity-price sensitivity cases.
(e) COMMUNITY AND TRIBAL RIGHTS. Title V and section 107 apply. Public assistance shall not substitute for lawful access to Tribal land, extinguish treaty rights, or shift unfunded cleanup to a community. Financial assurance shall be established before a material closure liability is created.
SEC. 2012. BATTERIES, STORAGE, AND POWER ELECTRONICS.
(a) PROGRAM. Energy and Commerce shall support batteries, long-duration storage, power conversion, grid-forming equipment, storage management, and the components and recycling systems necessary for reliable operation.
(b) EVIDENCE. A demonstration shall test duty cycles, degradation, thermal behavior, safety, round-trip efficiency, usable capacity, supply dependence, and end-of-life management. Nameplate capacity shall be distinguished from reliably deliverable energy and power over the claimed lifetime.
(c) SAFETY AND RECOVERY. Awards shall include fire and emergency planning appropriate to the technology, traceable materials, repair or replacement procedures, and a funded take-back or recovery arrangement where applicable. A recipient shall not export a waste burden under the label of recycling without verifying lawful handling.
(d) MEASURES. Performance shall include cost per delivered service, availability, cycling or calendar life, critical-material intensity, recovered material actually reused, and independently tested safety results.
(e) MARKET DESIGN. A project relying on multiple revenue streams shall demonstrate that those services can be provided without double-committing the same capacity. A Federal award is not a guarantee of utility cost recovery, market access, or a future purchase price.
SEC. 2013. ELECTRIC TRANSMISSION, DISTRIBUTION, AND GRID EQUIPMENT.
(a) PROGRAM. Energy shall support grid planning tools, transformers, switchgear, conductors, sensors, grid-enhancing technologies, distribution automation, resilience, and interconnection improvements needed for verified public and industrial demand.
(b) NEED. A major project shall identify the reliability, congestion, connection, or resilience problem; alternatives; beneficiaries; expected load; and allocation of costs. Speculative demand shall be separately identified and shall not be treated as a binding customer obligation.
(c) CAPACITY. Assistance may support domestic manufacturing of long-lead equipment, qualification of alternative designs, workforce training, and strategic replacement inventories, with controls against duplicate procurement and unnecessary stock accumulation.
(d) MEASURES. Awards shall measure delivered capacity, outage reduction, connection time, equipment delivery, reliability under credible hazards, and lifecycle costs. Installed equipment shall not be counted as an operational improvement before testing and integration.
(e) REGULATORY BOUNDARIES. FERC, State commissions, and other competent authorities retain their jurisdiction. This section does not approve a rate, condemn property, waive a siting requirement, or shift a private customer’s attributable costs to households contrary to law or the award.
SEC. 2014. ADVANCED NUCLEAR ENERGY AND NUCLEAR ENABLING TECHNOLOGY.
(a) PROGRAM. Energy shall support research, demonstration, manufacturing capability, safety instrumentation, qualified components, fuels lawfully available, and waste-management technologies for nuclear energy, subject to applicable nuclear law.
(b) DECISION STAGES. A project shall separately demonstrate design maturity, licensing pathway, supply assurance, construction controls, operational capability, security, waste disposition, and financial responsibility. The Nuclear Regulatory Commission shall retain independent licensing and safety decisions.
(c) COST AND RISK. Major awards shall include independent cost and schedule reviews, construction contingencies within the funded ceiling, decommissioning provisions, and sensitivity to first-of-a-kind delays. A demonstration award shall not imply that later commercial units will achieve an unverified cost reduction.
(d) MEASURES. Evaluation shall include qualified component delivery, tested safety performance, construction progress, reliable output where licensed, lifecycle emissions, fuel availability, and waste and closure obligations.
(e) LIMITS. This section authorizes no possession of nuclear material, reactor operation, security exemption, liability exemption, or waste disposal outside existing law. Federal assistance does not remove an operator’s responsibility for license compliance or make the innovation program an unlimited insurer.
SEC. 2015. GEOTHERMAL AND OTHER CLEAN FIRM ENERGY SYSTEMS.
(a) PROGRAM. Energy shall support geothermal resource characterization, enhanced and closed-loop systems, drilling technologies, heat networks, and other firm energy systems that independently meet the clean-electricity standard in section 504.
(b) CHARACTERIZATION. A project shall evaluate resource quality, geological uncertainty, induced seismicity, water use, subsurface containment, surface impacts, and long-term productivity. An exploration result shall be identified as preliminary until sustained performance is demonstrated.
(c) COMMUNITY PROTECTION. Awards shall include monitoring, emergency procedures, complaint response, and a plan to address material unexpected effects. Subsurface access and water rights shall be obtained under applicable law.
(d) MEASURES. Milestones shall include verified temperature or resource performance, drilling success, sustained useful energy, availability, cost, water balance, and lifecycle emissions. The agency shall distinguish exploration risk from operating risk when selecting a grant or credit instrument.
(e) INFRASTRUCTURE. Shared drilling data, testing facilities, district-energy integration, and training may be funded where public benefit and access are established. Commercially confidential information shall be protected while retaining sufficient data for independent verification of publicly supported results.
SEC. 2016. RENEWABLE GENERATION AND INDUSTRIAL HEAT.
(a) PROGRAM. Energy shall support improvements in solar, wind, marine renewable technologies, renewable thermal systems, industrial heat pumps, and enabling equipment that address a documented performance, production, integration, or supply bottleneck.
(b) SYSTEM VALUE. A project shall assess delivered energy, grid integration, storage or flexibility needs, land and habitat effects, maintenance, materials, and retirement obligations. Low equipment cost alone is not proof of low total system cost.
(c) INNOVATION AND DEPLOYMENT. Research and demonstration may support emerging technologies with substantial uncertainty. Commercial deployment assistance shall require additionality and coordination with existing incentives so that ordinary investment is not subsidized twice.
(d) MEASURES. Awards shall use actual energy or useful heat delivered, verified availability, installation and operating cost, manufacturing yield, resource intensity, and end-of-life recovery. Avoided-emissions claims shall identify their baseline and shall not be added to clean-electricity certificates as though they were separate physical reductions.
(e) SAFEGUARDS. Wildlife, coastal, maritime, land-use, worker-safety, and environmental law remain applicable. A designation under this section creates no lease, right-of-way, or authorization to bypass consultation.
SEC. 2017. CLEAN HYDROGEN AND INDUSTRIAL FEEDSTOCKS.
(a) PROGRAM. Energy shall support research, demonstration, production equipment, storage, transport, and industrial uses of hydrogen or related feedstocks where a lifecycle analysis establishes a material emissions reduction and a credible use case.
(b) ELIGIBILITY. A project claiming clean-hydrogen support shall satisfy the lifecycle threshold and verification requirements in section 609. Electricity inputs, methane leakage, process emissions, water use, transport, and conversion losses shall be included where material. An accounting label does not replace a physical emissions assessment.
(c) DEMAND. Commercial awards shall identify enforceable demand or a competitively justified public purpose and compare feasible direct electrification, efficiency, and alternative feedstocks. A subsidy shall not be awarded merely to create a product without a useful customer or application.
(d) MEASURES. Performance shall include verified lifecycle emissions per unit, actual delivered product, energy and water requirements, leakage, safety, and cost at realistic utilization. Production and downstream use shall not both claim the same reduction without a consistent attribution method.
(e) SAFETY. Applicable process, pipeline, transport, occupational, and environmental requirements remain in force. Assistance does not authorize a storage site or transport facility without the requisite approvals.
SEC. 2018. CARBON MANAGEMENT AND DURABLE REMOVALS.
(a) PROGRAM. Energy and the Administrator shall support measurement, capture, transport, storage, mineralization, and removal research or demonstration where net climate benefit is independently evaluated and local environmental risks are controlled.
(b) ACCOUNTING. Awards shall distinguish avoided emissions, captured emissions, temporary utilization, and removal from the atmosphere. Energy use, upstream and downstream emissions, leakage, permanence, and displacement effects shall be included in a published methodology. A short-lived product is not durable storage solely because it contains carbon.
(c) STEWARDSHIP. A storage project shall establish lawful pore-space access, permit compliance, monitoring, corrective action, financial assurance, and a legally responsible steward. A corporate reorganization shall not leave the storage obligation without a responsible funded entity.
(d) MEASURES. Milestones shall include independently verified net tonnes, measurement uncertainty, storage integrity, cost, energy demand, and continuing liability. Contracted future removals shall not be counted as completed removals.
(e) LIMITS. A Federal award does not automatically transfer long-term liability to the United States. The limited use of removals for facility compliance remains subject to section 503; funding carbon management does not waive local air, water, or hazardous-substance standards.
SEC. 2019. TRANSPORTATION ELECTRIFICATION AND CHARGING SYSTEMS.
(a) PROGRAM. Transportation and Energy shall support charging equipment, power management, fleet integration, electric drivetrains, batteries in transportation applications, accessibility, and grid coordination.
(b) DEPLOYMENT. Projects shall identify real travel or fleet needs, utility readiness, interoperability, maintenance, pricing disclosure, payment access, and geographic coverage. Equipment installed without dependable power or maintenance shall not be reported as an available charging service.
(c) ACCESS. Publicly supported charging shall provide transparent total prices, accessible operation, nondiscriminatory payment options, and interoperability consistent with safety. A user shall not be required to disclose unrelated personal information to obtain an ordinary charging service.
(d) MEASURES. Awards shall evaluate verified uptime, successful sessions, delivered energy, reliability in different conditions, accessibility, utilization, and total lifecycle cost. Vehicle or charger counts shall be reported separately from demonstrated service outcomes.
(e) SAFETY AND GRID COST. Applicable vehicle, electrical, fire, labor, and utility requirements remain in force. Projects shall identify attributable grid costs and shall not rely on an undisclosed household subsidy for a private fleet’s dedicated infrastructure.
SEC. 2020. RAIL, PUBLIC TRANSIT, AND INTELLIGENT TRANSPORTATION.
(a) PROGRAM. Transportation shall support rail equipment, signaling, transit reliability, accessibility, traffic safety tools, freight coordination, and resilient transportation infrastructure with a documented service or productivity need.
(b) PROJECT PLAN. A deployment award shall identify users, service frequency or throughput, integration with existing systems, operating finance, maintenance, accessibility, and the relevant safety regulator. A capital award shall not assume that a local operator has committed operating funds when it has not.
(c) DIGITAL SYSTEMS. Intelligent transportation systems shall minimize personal data, provide appropriate human oversight, and use interoperable standards. Assistance shall not create a general location-tracking system unrelated to the transport function.
(d) MEASURES. Milestones shall include reliable service delivered, travel time, safety outcomes, accessibility, equipment availability, and operating cost. Forecast ridership shall be separately identified from actual ridership, and a shorter trip for one group shall not conceal a material new burden on another.
(e) AUTHORITY. Safety certification, rights-of-way, labor protections, environmental review, and local service decisions remain governed by applicable law. This section does not compel a State or locality to operate a new service without accepting a funded agreement.
SEC. 2021. AVIATION, AEROSPACE MANUFACTURING, AND SUSTAINABLE PROPULSION.
(a) PROGRAM. Transportation, NASA, Energy, and Commerce shall support efficient aircraft systems, propulsion research, manufacturing, materials, aviation infrastructure technology, and fuels with independently established lifecycle benefits.
(b) CERTIFICATION PATH. A safety-critical project shall identify the applicable certification pathway, testing, quality system, maintenance, human factors, and responsible regulator. Federal research support is not airworthiness approval or authorization for passenger service.
(c) FUELS. A fuel project shall substantiate feedstock origin, land-use effects where material, processing energy, transport, lifecycle emissions, and competition with essential food or resource needs. A blend label or purchase commitment alone does not establish a reduction.
(d) MEASURES. Awards shall evaluate independently tested efficiency, reliability, noise, emissions, manufacturing quality, certification progress, and cost. Simulated or projected performance shall be clearly distinguished from validated flight or production results.
(e) SUPPLY AND RIGHTS. Domestic manufacturing commitments, allied collaboration, intellectual-property protection, and controlled-technology rules apply. Assistance shall not finance export transactions prohibited by law or require transfer of unrelated proprietary technology without a lawful agreed basis.
SEC. 2022. CIVIL SPACE, SATELLITES, AND SPACE SERVICES.
(a) PROGRAM. NASA, with Commerce for civil commercial coordination, shall support civil space science, satellite components, launch enabling technologies, communications and navigation resilience, Earth observation, and services addressing a documented public or research need.
(b) PROJECT CONDITIONS. An award shall identify mission objectives, test evidence, launch and operating authorizations, collision avoidance, spectrum coordination, cybersecurity, end-of-life disposal, and financial responsibility where applicable.
(c) PUBLIC DATA. Data purchased for a public scientific purpose shall be made available under the negotiated rights and title III, with lawful exceptions for privacy, security, and commercial restrictions expressly justified before award. A vendor may not impose new restrictions after publicly funded collection contrary to the agreement.
(d) MEASURES. Performance shall include validated mission capability, service reliability, data quality, latency where relevant, actual useful lifetime, cost, and compliance with debris-mitigation commitments. A launch announcement is not a completed mission.
(e) LIMITS. This section creates no military mission, weapon authority, spectrum right, launch license, or exemption from export law. Private observation systems funded under this Act remain subject to applicable privacy, remote-sensing, and data-use restrictions.
SEC. 2023. MARITIME TECHNOLOGY, PORTS, AND SHIPBUILDING.
(a) PROGRAM. Transportation and Commerce shall support shipyard production technology, maritime components, port reliability, cargo handling, clean propulsion research, worker safety, and resilient domestic repair capability.
(b) NEED. A major award shall identify vessel or port requirements, customers, workforce, berth or yard capacity, equipment, energy, environmental controls, and operating finance. Infrastructure expansion shall be tied to credible demand rather than an unsupported throughput claim.
(c) INTEROPERABILITY. Publicly supported logistics systems shall permit lawful exchange of necessary information without requiring carriers or shippers to surrender unrelated competitively sensitive data to a competing operator.
(d) MEASURES. Awards shall evaluate build or repair time, qualified output, vessel availability, cargo reliability, worker safety, emissions, and total operating cost. Faster cargo movement shall not be counted as a benefit without accounting for material congestion, pollution, or safety effects shifted to neighboring communities.
(e) LAW. Maritime safety, customs, environmental, labor, cabotage, procurement, and national-security laws remain applicable. A priority designation does not create an exemption from an existing shipping requirement or authorize dredging or construction without approval.
(a) PROGRAM. HHS, NSF, and Agriculture within their respective missions shall support biological measurement, platform research, tools, therapies, diagnostics, and other beneficial applications with appropriate scientific, ethical, and safety review.
(b) OVERSIGHT. Awards shall identify applicable biosafety, biosecurity, human-subject, animal-welfare, and dual-use review requirements before research begins. The responsible institution shall maintain competent oversight and a reporting channel independent of commercial pressure.
(c) RESEARCH QUALITY. Protocols shall address reproducibility, appropriate controls, validation, data integrity, and disclosure of material limitations. A discovery in a model system shall not be represented as an established human benefit without supporting evidence.
(d) MEASURES. Milestones shall use validated capability, reproducibility, safety, translation readiness, and the public-health or scientific question answered. Patent counts and private valuation shall not replace scientific outcomes.
(e) LIMITS. This section authorizes no otherwise prohibited biological work, clinical use, release, or acquisition of controlled material. Assistance shall not be conditioned on suppressing negative results or on transferring sensitive biological information to an unqualified partner.
SEC. 2025. BIOMANUFACTURING AND INDUSTRIAL FERMENTATION.
(a) PROGRAM. HHS, Agriculture, Energy, and Commerce shall support biomanufacturing processes, fermentation, downstream purification, process control, shared pilot capacity, and production of useful chemicals, materials, food ingredients, or medical inputs.
(b) SCALE EVIDENCE. A project shall demonstrate feedstock availability, yield, contamination control, purification, waste and wastewater management, energy demand, product qualification, and a credible customer. Laboratory yield shall not be assumed to persist at commercial scale without a documented basis.
(c) CONTAINMENT. Awards shall require containment, traceability, emergency response, and regulatory review appropriate to the organism, process, and product. A closed-system label shall not substitute for verified controls and monitoring.
(d) MEASURES. Evaluation shall include qualified output, batch consistency, yield, resource use, lifecycle emissions, waste burden, and unit cost at realistic capacity utilization.
(e) SHARED ACCESS. Publicly supported pilot facilities shall establish transparent access, confidentiality, scheduling, and contamination-control terms. Public support shall not be used to obtain a competitor’s proprietary strain, process, or customer information outside the agreed lawful purpose.
SEC. 2026. PHARMACEUTICALS AND ACTIVE PHARMACEUTICAL INGREDIENTS.
(a) PROGRAM. HHS shall support domestic capability for active pharmaceutical ingredients, essential medicines, advanced pharmaceutical manufacturing, quality testing, and resilient supply of products with a documented public-health need.
(b) ADDITIONALITY. A commercial award shall identify the supply vulnerability, qualification pathway, manufacturing capacity, quality system, workforce, demand, and access commitment. Domestic location alone does not establish that a proposed product will address a shortage or remain available at a useful price.
(c) CONDITIONS. Section 1103 applies to public access. The award shall identify production and supply commitments, notification of interruption, inventory policy where appropriate, and contingency arrangements. HHS shall coordinate without replacing FDA’s independent approval and inspection responsibilities.
(d) MEASURES. Milestones shall include qualified batches, release quality, actual supply availability, time to recovery after disruption, patient or purchaser access, and production cost. Unapproved output shall not be counted as medicine available to patients.
(e) INTELLECTUAL PROPERTY. Patent, exclusivity, licensing, and competition law remain applicable except for express prospective agreement terms authorized by this Act. An agency shall not invoke an undefined public-interest power to confiscate unrelated intellectual property.
SEC. 2027. MEDICAL DEVICES, DIAGNOSTICS, AND IMAGING.
(a) PROGRAM. HHS shall support medical devices, diagnostics, imaging, laboratory instruments, manufacturing, and repair capability that address a documented clinical, access, or supply need.
(b) VALIDATION. A project shall identify its intended use, population, clinical evidence, safety risks, regulatory pathway, cybersecurity, human factors, and postmarket support. A diagnostic performance claim shall distinguish analytical validity from clinical usefulness in the intended setting.
(c) ACCESS AND SERVICE. Major awards shall include maintenance, spare parts, necessary software support, training, and a credible affordability or public-access commitment under section 1103. An essential device shall not become unusable solely because a vendor discontinues an avoidable proprietary service contrary to the award.
(d) MEASURES. Evaluation shall include validated accuracy where relevant, patient outcomes where established, failure rates, usability, availability, total lifecycle cost, and access for underserved settings. An installed device count is not equivalent to effective treatment.
(e) REGULATION. FDA and other competent regulators retain authority. Procurement or research funding is not product clearance, approval, clinical certification, or a finding that an autonomous diagnostic system may replace required professional judgment.
SEC. 2028. DIGITAL HEALTH AND INTEROPERABLE CARE INFRASTRUCTURE.
(a) PROGRAM. HHS shall support interoperable health information systems, telehealth infrastructure, secure clinical communication, decision support, remote monitoring, and accessibility where a project addresses a demonstrated care or administrative need.
(b) EVIDENCE. An award shall identify intended users, workflow, clinical validation where needed, data sources, privacy, cybersecurity, accessibility, reimbursement assumptions, and integration with existing systems. A reduction in administrative effort shall not be achieved by shifting unacknowledged work to patients or clinicians.
(c) DATA RIGHTS. Title X and applicable health-information law apply. A recipient shall not sell or use patient information for unrelated advertising or model development merely because a platform was publicly funded. Interoperability shall protect appropriate consent, access controls, and clinical context.
(d) MEASURES. Awards shall evaluate actual care access, validated outcomes, reliability, burden reduction, successful exchange, security, and total cost. App downloads, engagement time, and data volume alone do not establish a health benefit.
(e) PROFESSIONAL RESPONSIBILITY. The award shall identify meaningful human review where a system materially affects care. This section does not expand a professional license, authorize practice across jurisdictions contrary to law, or displace product and clinical regulation.
SEC. 2029. PUBLIC HEALTH PREPAREDNESS AND ESSENTIAL MEDICAL SUPPLIES.
(a) PROGRAM. HHS shall support detection, laboratory capacity, protective equipment, essential consumables, supply-chain visibility, stockpile management technology, and surge manufacturing for defined public-health threats.
(b) READINESS. A project shall establish storage conditions, expiration management, rotation, qualification, distribution, maintenance, and the time needed to activate production. A dormant production line shall not be counted as immediately available surge capacity without a verified readiness test.
(c) DATA. Public-health systems shall minimize identifiable information, apply appropriate authorization and security, and avoid creation of unrelated population-surveillance infrastructure. Aggregated reporting shall preserve useful epidemiological information without unnecessary individual exposure.
(d) MEASURES. Evaluation shall include validated detection performance, qualified supply availability, exercise results, activation time, wastage, and access to essential products. A theoretical production maximum shall be distinguished from demonstrated sustained output.
(e) AUTHORITY AND ACCESS. Emergency public-health powers remain governed by their own statutes. An innovation award does not authorize compulsory treatment, quarantine, or emergency product use. Publicly supported preparedness products shall carry the supply and access obligations stated before award.
SEC. 2030. PRECISION AGRICULTURE AND FARM SYSTEMS.
(a) PROGRAM. Agriculture shall support sensors, farm equipment, decision tools, irrigation technology, soil and crop measurement, livestock monitoring, and practical extension services that improve verified agricultural performance or reduce resource burdens.
(b) FIELD VALIDATION. Projects shall test under relevant soils, climates, farm sizes, and production systems. A result from one controlled field shall not be represented as universally applicable without evidence. Farmers participating in trials shall receive clear risk, cost, data, and termination terms.
(c) FARMER CONTROL. Section 1105 applies to data access, portability, repair, and contractual fairness. Assistance shall not require farmers to purchase unrelated inputs or permanently surrender independently generated farm data to one vendor.
(d) MEASURES. Milestones shall include net farm income or documented cost reduction, yield and quality where relevant, water and chemical use, soil effects, reliability, repair time, and adoption without coercive lock-in. Sales of a tool shall be distinguished from a verified agronomic benefit.
(e) ACCESS. Extension and demonstration programs shall include smaller and remote producers, accessible training, and alternatives for limited connectivity. Existing food, animal-health, environmental, and worker-protection requirements remain applicable.
SEC. 2031. CLIMATE-RESILIENT CROPS AND AGRICULTURAL BIOTECHNOLOGY.
(a) PROGRAM. Agriculture and NSF shall support crop science, breeding, plant health, soil biology, conservation tools, and agricultural biotechnology directed to resilience, nutrition, resource efficiency, and reliable production.
(b) EVIDENCE. Awards shall specify target conditions and assess yield stability, nutritional or functional characteristics, ecological effects, pest and disease response, and performance across relevant environments. A climate-resilience claim shall identify the stress tested and tradeoffs observed.
(c) RIGHTS AND ACCESS. Agreements shall state intellectual-property and seed-access terms before participation. Publicly funded public-good germplasm and nonconfidential research results shall be available under title III and applicable law, with lawful protections for proprietary contributions and Tribal knowledge.
(d) SAFETY. Field release, food use, environmental review, and plant-health requirements remain governed by competent authorities. Funding shall not be represented as approval of a genetically engineered product or a finding that all possible uses are safe.
(e) MEASURES. Programs shall evaluate reproducible field performance, resilience under specified conditions, resource demand, agronomic practicality, and access by intended producers. Patent activity or a single season’s result shall not alone establish long-term success.
SEC. 2032. FOOD PROCESSING, ALTERNATIVE PROTEINS, AND FOOD-SYSTEM RESILIENCE.
(a) PROGRAM. Agriculture and HHS shall support safe food processing, cold chains, waste reduction, traceability, fermentation-derived foods, alternative proteins, and technologies that improve nutrition, affordability, reliability, or resource performance.
(b) VALIDATION. A project shall establish safety, nutritional characteristics, shelf life, process consistency, consumer information, resource demand, and a credible market or public-service need. Environmental comparisons shall use consistent functional units and disclose material assumptions.
(c) REGULATION. FDA, Agriculture, and other competent authorities retain their food-safety, labeling, inspection, and approval responsibilities. An award does not authorize a product’s sale or make a nutrition or health claim lawful.
(d) MEASURES. Evaluation shall include safe qualified output, loss reduction, affordability, nutritional performance where relevant, resource intensity, and distribution reliability. Production capacity shall not be equated with consumer adoption or a proven health outcome.
(e) COMPETITION AND ACCESS. Shared processing and storage infrastructure shall offer transparent terms to eligible unaffiliated users. A dominant buyer shall not use an assisted facility to compel exclusive supplier relationships unrelated to necessary quality or capacity commitments.
SEC. 2033. WATER TREATMENT, REUSE, AND EFFICIENT DELIVERY.
(a) PROGRAM. EPA, Energy, and Commerce shall support drinking-water treatment, wastewater technology, reuse, desalination where appropriate, leak reduction, sensing, and efficient industrial water systems.
(b) SYSTEM ANALYSIS. A project shall evaluate source availability, water quality, energy, treatment residuals, discharge, maintenance, operator capacity, affordability, and alternatives including conservation. A proposed supply shall not be considered available without lawful rights and a reliable source assessment.
(c) PUBLIC PROTECTION. Treatment claims shall be independently validated for the relevant contaminants and conditions. Projects shall identify residual and concentrate handling and shall not solve one water problem by creating an undisclosed downstream burden.
(d) MEASURES. Milestones shall include safe water delivered, verified contaminant removal, leakage reduction, reuse actually achieved, energy per useful service, operating cost, and reliability. A plant’s rated capacity shall be distinguished from compliant output.
(e) UTILITIES AND COMMUNITIES. Public-system awards shall include trained operation, maintenance finance, emergency response, and appropriate affordability protections. Existing water rights, drinking-water standards, discharge permits, and Tribal rights remain in force.
SEC. 2034. CONSTRUCTION TECHNOLOGY AND RESILIENT BUILDINGS.
(a) PROGRAM. Commerce, Energy, and the Department of Housing and Urban Development shall support industrialized construction, building components, design and inspection tools, efficiency, accessibility, and resilient materials or methods.
(b) VALIDATION. A project shall establish structural, fire, moisture, durability, energy, accessibility, and repair performance appropriate to its intended use. A factory-produced component shall not bypass the building code or inspection requirements applicable to the completed structure.
(c) COST AND DELIVERY. Awards shall identify land and permitting assumptions, transport, installation, financing, workforce, maintenance, and the intended affordability or productivity benefit. Lower factory cost alone shall not be reported as lower occupied-building cost.
(d) MEASURES. Evaluation shall include completed compliant structures or components, construction time, total cost, defect rates, energy use, hazard performance, and maintenance. Housing-related outcomes shall distinguish units announced, started, completed, occupied, and affordable under the stated definition.
(e) LOCAL AUTHORITY. This section creates no Federal zoning mandate or permit. State and local participation is voluntary, and relocation or displacement caused by a funded project shall be addressed under applicable law and the award’s community plan.
SEC. 2035. EDUCATION TECHNOLOGY AND ACCESSIBLE LEARNING SYSTEMS.
(a) PROGRAM. The Department of Education and NSF, with Commerce for eligible commercialization, shall support accessible instructional tools, learning research, assistive interfaces, teacher support, and secure educational infrastructure.
(b) EVIDENCE. An award shall specify the educational objective, learner population, comparison method, accessibility, teacher involvement, privacy, and evaluation plan. A product claiming to improve learning shall be evaluated on learning or other independently justified educational outcomes, not solely usage or engagement.
(c) CHILDREN AND SCHOOLS. Title X and applicable student-privacy law govern. Participation shall not require unrelated advertising profiles, commercial exploitation of student information, or automated high-impact decisions without the safeguards in section 1004.
(d) MEASURES. Programs shall assess learning outcomes where measurable, accessibility, teacher and student burden, reliability, cost, and effects across relevant settings. An effective result in one setting shall not be represented as universal proof.
(e) GOVERNANCE. Educational institutions retain lawful curriculum and academic responsibilities. Funding shall not require endorsement of a political viewpoint or substitute a vendor’s proprietary system for a school’s legally required accountability and professional judgment.
SEC. 2036. WORKFORCE LEARNING, CREDENTIALS, AND ASSISTIVE EMPLOYMENT TOOLS.
(a) PROGRAM. Labor and Education, in coordination with Commerce and sector agencies, shall support paid training tools, simulation, portable credentials, skills assessment, accessibility, and transition assistance linked to demonstrated employment or professional needs.
(b) PROVIDER TERMS. A provider shall disclose cost, prerequisites, completion, independent assessment, employer recognition, and the evidence behind placement claims. Assistance shall not support misleading guarantees of employment or credentials that lack a credible use.
(c) WORKER RIGHTS. Training shall be accessible and shall not impose an unreasonable debt or repayment penalty on a worker who leaves employment. Existing lawful wage, apprenticeship, collective-bargaining, and licensing requirements remain applicable.
(d) MEASURES. Awards shall evaluate verified completion, skill attainment, recognized credentials, actual employment where relevant, wage progression, retention, and participant experience, while distinguishing selection effects from training effects.
(e) PORTABILITY. Publicly funded credentials and records shall be available to the worker in an accessible portable form. A worker shall not lose proof of completed training solely because an employer changes vendors, terminates a contract, or closes an assisted facility.
SEC. 2037. FINANCIAL TECHNOLOGY, SECURE PAYMENTS, AND USER-CONTROLLED IDENTITY.
(a) PROGRAM. Commerce and NIST, in consultation with Treasury and competent financial regulators, shall support secure payment infrastructure, fraud prevention, accessible financial tools, privacy-preserving identity verification, and interoperability serving a documented public or productive need.
(b) CONDITIONS. Awards shall identify the legal and regulatory status of the proposed service, custody and settlement arrangements, consumer protections, cyber resilience, fraud response, and accessibility. Funding is not a banking charter, securities exemption, deposit insurance, or a government endorsement of a financial product.
(c) IDENTITY. Identity systems shall minimize collected information, provide alternatives where practicable, support correction, and avoid a mandatory centralized biometric identifier. A recipient shall not use verification data for unrelated commercial profiling.
(d) MEASURES. Evaluation shall address actual fraud reduction, false rejections, accessibility, transaction reliability, cost, privacy, and recovery from error. Transaction volume alone is not evidence of consumer benefit.
(e) EXCLUSIONS. Assistance shall not finance speculative purchases of digital assets, support a promised token price, reimburse investor losses, or fund a scheme primarily intended to evade financial regulation. Research concerning distributed systems may qualify on its technical merits without those prohibited uses.
SEC. 2038. CREATIVE, ENTERTAINMENT, AND CULTURAL-PRODUCTION TECHNOLOGY.
(a) PROGRAM. Commerce and NSF, in consultation with relevant cultural institutions, shall support audio and video production tools, accessible performance technology, virtual and interactive production, digital preservation, rights administration, and tools used by independent creators and smaller production enterprises.
(b) ELIGIBLE COST. Assistance shall support research, equipment, software, shared facilities, training, or a validated production innovation. Ordinary celebrity compensation, acquisition of a catalog solely for investment, political advertising, and financing a finished entertainment work without a qualifying technological purpose are not eligible under this section.
(c) CREATOR RIGHTS. Section 1106 governs digital replicas, contractual consent, and rights records. Awards shall preserve lawful copyright, fair use, publicity, labor, and expressive rights; a recipient shall not present public funding as authorization to copy or impersonate a person without the required legal basis.
(d) MEASURES. Evaluation shall include creator access, workflow efficiency, accessibility, interoperability, quality, cost, and adoption by intended users. Popularity or agreement with a work’s message shall not be an award criterion.
(e) ACCESS. Shared facilities shall provide transparent booking, pricing, intellectual-property terms, and data export. An independent artist shall not be required to transfer unrelated creative rights as the price of using publicly supported equipment.
SEC. 2039. EMERGENCY RESPONSE, DISASTER RESILIENCE, AND PUBLIC-SAFETY TECHNOLOGY.
(a) PROGRAM. Homeland Security, Commerce, Transportation, and relevant scientific agencies shall support warning systems, resilient communications, disaster modeling, protective equipment, emergency logistics, and tools that improve lawful response and recovery.
(b) VALIDATION. A project shall identify the hazard, intended users, false-alarm and missed-event risks, accessible warnings, operating responsibility, maintenance, and testing under realistic conditions. A model shall disclose uncertainty and shall not be represented as a guarantee that an event will or will not occur.
(c) CIVIL LIBERTIES. Assistance shall not create a general surveillance or predictive-policing mandate, authorize force, or permit discriminatory decision-making. Personal information shall be limited to the lawful response purpose and subject to title X.
(d) MEASURES. Awards shall evaluate warning delivery, response time, reliability during outages, accessibility, recovery capability, and independently verified reduction of exposure or loss. Procurement counts shall be separated from demonstrated operational readiness.
(e) LOCAL PARTICIPATION. State, local, and Tribal participation shall be voluntary and supported by clear operating and cost agreements. Exercises shall not be used to bypass lawful consent, land access, emergency authority, or safety requirements.
SEC. 2040. CIRCULAR ECONOMY, MEASUREMENT SCIENCE, AND ENABLING PUBLIC INFRASTRUCTURE.
(a) PROGRAM. Commerce, NIST, EPA, and Energy shall support repair, reuse, disassembly, materials recovery, lifecycle measurement, calibration, reference data, and enabling public infrastructure that connects the preceding sectors and addresses a demonstrable common bottleneck.
(b) PUBLIC PURPOSE. A cross-sector project shall identify its users, shared function, access terms, technical uncertainty, and allocation of costs. This section shall not operate as a residual authority to finance any activity that does not qualify under the Act.
(c) VERIFICATION. Circularity claims shall distinguish material collected, sorted, recovered to specification, and actually returned to useful production. Exported waste, incineration, inventory accumulation, or a contractual promise of future recycling shall not be counted as completed material recovery without the applicable verified basis.
(d) MEASURES. Awards shall evaluate useful product-life extension, recovered material quality, reduced virgin resource demand, independently reproducible measurement, cost, and environmental burdens across the relevant lifecycle.
(e) SHARED STANDARDS. Publicly supported reference methods and nonconfidential data shall be accessible under title III. A private standards organization may contribute expertise but shall not obtain automatic power to change legal duties, exclude competitors, or charge an undisclosed monopoly fee for compliance with a publicly funded requirement.